Infrastructure

The company is having all the required infrastructure to manufacture the products as per WHO cGMP requirement and complies to EU GMP norms. The company has a built up area of about 50000 sq. feet for production and storage of its products spread over 6000 sq. feet of Area.

The infrastructure includes dedicated HAVC systems with environment control (temp and humidity) at individual production steps and auxiliary area's. Complete water management system with loop, separate storage and supply management system for each categories of drugs.

Services including compressed air, refrigeration, electricity generation, purified water plant, distillation plant, ETP plants and boiler for steam generation are provided in the engineering block.

SYSTOCHEM invests almost 40% of its Annual Profits in latest plant and machinery along with training of technical personnel ensuring continues upgrade of the of quality of its products in line with excellent technology.